• Sludge treatment project at Song Da water supply plant
  • Sludge treatment project at Song Da water supply plant
  • Sludge treatment project at Song Da water supply plant
  • Sludge treatment project at Song Da water supply plant
  • Sludge treatment project at Song Da water supply plant
  • Sludge treatment project at Song Da water supply plant
  • Sludge treatment project at Song Da water supply plant
  • Sludge treatment project at Song Da water supply plant
  • Sludge treatment project at Song Da water supply plant
  • Sludge treatment project at Song Da water supply plant

Sludge treatment project at Song Da water supply plant

  • Construction year: September 2023
  • Location: Vat Lai Hamlet - Thinh Minh Commune - Hoa Binh City - Hoa Binh Province
  • Sludge type: Water supply plant
  • Machine type: Decanter Centrifuge R350 x 3
  • Capacity: 120m³/h

PROJECT OVERVIEW


Join ARK Vietnam for an overview of the sludge treatment project for Song Da water supply plant:

Name Sludge treatment project at Song Da water supply plant
Investor SONG DA WATER INVESTMENT JSC
Location Vat Lai Hamlet - Thinh Minh Commune - Hoa Binh City - Hoa Binh Province
Contractor ARK Vietnam Co., Ltd
Construction category Supplying equipment, designing and constructing a wastewater sludge treatment system for Song Da water supply plant
Equipment installation Decanter Centrifuge, Polymer mixing equipment
Capacity 120 m³/h

See more: Sludge dewatering project at Dong Anh water supply plant

Introducing Song Da water supply plant

SONG DA WATER INVESTMENT JSC (Viwasupco) was established in 2009, with the goal of maintaining a stable water supply and ensuring safe and clean water quality for the people of Hanoi city. Currently, the Company is the only unit providing clean water from Da River surface water source to Hanoi Capital with an average capacity in 2022 of 292,000 m3/day and night.

Due to increased water demand in 2023, the plant is operating at full capacity for the first phase, providing customers with an average of about 300,000 m3/day and night. Phase 2 of Da River Water Plant includes: Water plant and Water source exploitation project under the investment project to build urban water supply system Son Tay - Hoa Lac - Xuan Mai - Mieu Mon - Hanoi - Ha Dong phase II, increasing capacity to 600,000m3/day and night is expected to be completed and put into use in the fourth quarter of 2024.

If you have any demand for sludge treatment system design or purchase an advanced and modern sludge dewatering machine, please contact us immediately for enthusiastic and fast consulting.
Phone number: 0977.675.754 (Mr Truc)
Website: www.arkvietnam.com
Email: [email protected]
Hanoi Office: 5th floor, N03-T7 Diplomatic Urban Area, Xuan Tao Ward, Bac Tu Liem District, Hanoi.
HCMC Office: 68 - 70 Hoang Dieu Street, Ward 13, District 4, HCM City.

popup lễ ký kết ark với Nước sạch Sông Đà